            Requirements for installation of FRP pipes

            1、玻璃鋼防腐管道在安裝前應(yīng)對設(shè)備管口、預(yù)埋件、預(yù)留孔洞、鋼結(jié)構(gòu)等涉及管道安裝的內(nèi)容進(jìn)行復(fù)核。

            1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

            2、管道的坡度應(yīng)按圖紙的要求進(jìn)行調(diào)整,調(diào)整方法可以利用支座達(dá)到坡度要求,焊縫應(yīng)設(shè)置在便于檢修、觀察的地方。

            2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

            3、與傳動(dòng)設(shè)備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應(yīng)遠(yuǎn)離設(shè)備,以避免焊接產(chǎn)生應(yīng)力對傳動(dòng)設(shè)備安裝精度的影響。

            3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

            4、管道與機(jī)器連接前,應(yīng)防止強(qiáng)力相對,在自由狀態(tài)下檢查法蘭的平行度和同軸度。

            4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

            5、安全閥應(yīng)垂直安裝,在投入試運(yùn)行時(shí),要及時(shí)調(diào)校安全閥。安全閥的調(diào)校在系統(tǒng)上進(jìn)行,開啟和回座壓力要符合設(shè)計(jì)文件的規(guī)定。

            5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

            6、閥門安裝前,按設(shè)計(jì)文件核對其型號,并按介質(zhì)流向確定其安裝方向。當(dāng)閥門與管道以法蘭或螺紋方式連接時(shí),閥門應(yīng)在關(guān)閉狀態(tài)下安裝;如以焊接方式安裝時(shí),閥門不得關(guān)閉。

            6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

            7、儀表元件的臨時(shí)替代:所有儀表元件安裝時(shí),均采用臨時(shí)元件替代,等試壓、沖洗、吹掃工作結(jié)束后,投料前再正式安裝。

            7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


          日韩伦理在线观看一区二区三区| 久久天堂一区二区三区av| 国产视频亚洲欧美日韩| 日韩美女草草免费视频| 亚洲天堂久久久久久| 桃色国产熟女精品视频| 天天干夜夜拍天天操天天射| 日韩成人无码影院| 国产一级黄色录像大片| 亚洲国产成人久久成人52| 久久人妻少妇一区二区| 里番本子纯肉侵犯肉全彩无码| 日本一区二区三区免费av| 久久综合欧美日韩亚洲国产| 亚洲天堂人妻一区二区| 久久国产精品偷| 国产精品福利一区二区三区| 特黄特色三级在线观看| 午夜福利成人高潮av| 久久精见国产亚洲av高清热| 国产精品久久久看三级| 日韩做a爰片久久毛片a片| 亚洲av人人澡人人爽人人夜夜| 国产日产久久高清欧美一区| 亚洲人成网亚洲欧洲无码久久| 亚洲最大国产成人综合网站| 无码一区二区三区av免费| 国产女同免费在线观看| 日本天堂一区二区在线观看| 日韩有码中文字幕在线| 亚洲中文字幕久久久一区| 高清一区二区三区日本久| av男人的天堂啪啪啪| 日韩久久精品一区二区三区介绍| 亚洲一二三无人区分别是哪| 香婷婷一区二区精品久久| 精品国产一区二区亚洲人成毛片| 四虎在线观看精品一区| 亚洲第一av一区二区三区| 亚洲天堂视频在线播放| 亚洲偷拍精品一区二区|